Section 7
Factory Installed Options
Options are available as factory or field installed, depending on the
territory. Please contact your local VWR representative for details. Refer
to the table in Appendix A-5 for the available field-installed options.
Note
Before installation of BUS components, make sure the power to the
freezer is disconnected, the battery switch is turned off (O) and the freezer
has warmed to ambient temperature.
s
The built-in BUS (back up system) will keep the freezer chamber
temperature below the critical level in the event of a power or equipment
failure. If power to the freezer fails, or temperature increases to the back up
alarm set point, the BUS injects liquefied gas into the chamber to keep the
chamber temperature within the specified range.
The BUS operates on an internal 12-volt, rechargeable battery which is
kept charged during normal operation by the integral battery charger.
1. Locate the mounting hole for
installing the injection tee assembly. See
Figure 7-1.
Note
Cover open end of injection
assembly with tape to keep insulation
from entering the nipple.
s
2. Slide 3/8” flatwasher over open end
of nipple.
3. Insert the covered end of the injection assembly through exterior hole.
Chest Freezer
7-1
VWR International
Back Up System (BUS)
Install Injection Assembly
Mounting hole
for injection tee
Figure 7-1.
Mounting location
Summary of Contents for VWRC0386A
Page 55: ...8 1 VWR Collection VWR International Section 8 Parts ...
Page 56: ...VWR Collection 8 2 VWR International Section 8 Parts ...
Page 59: ...8 5 VWR Collection VWR International Section 8 Parts ...
Page 60: ...VWR Collection 8 6 VWR International Section 7 Specifications ...
Page 61: ...VWR Collection 8 7 VWR International Section 8 Parts ...
Page 68: ...9 1 VWR Collection VWR International Section 9 Refrigeration Schematics ...
Page 69: ...VWR Collection 9 2 VWR International Section 9 Refirgeration Schematics ...
Page 70: ...VWR Collection 9 3 VWR International Section 9 Refirgeration Schematics ...
Page 71: ...9 4 VWR Collection VWR International Section 9 Refrigeration Schematics ...
Page 72: ...10 1 VWR Collection VWR International Section 10 Electrical Schematics ...
Page 73: ...VWR Collection 10 2 VWR International Section 10 Electrical Schematics ...
Page 74: ...10 3 VWR Collection VWR International Section 10 Electrical Schematics ...
Page 75: ...VWR Collection 10 4 VWR International Section 10 Electrical Schematics ...
Page 76: ...VWR Collection 10 5 VWR International Section 9 Section title ...
Page 77: ...10 6 VWR Collection VWR International Section 10 Electrical Schematics ...
Page 78: ...VWR Collection 10 7 VWR International Section 10 Electrical Schematics ...
Page 79: ...10 8 VWR Collection VWR International Section 10 Electrical Schematics ...
Page 80: ...VWR Collection 10 9 VWR International Section 10 Electrical Schematics ...
Page 81: ...10 10 VWR Collection VWR International Section 10 Electrical Schematics ...
Page 82: ...VWR Collection 10 11 VWR International Section 10 Electrical Schematics ...
Page 83: ...10 12 VWR Collection VWR International Section 10 Electrical Schematics ...
Page 93: ...VWR International D 2 Chest Freezer ...
Page 94: ......