Unpacking and Installation
12
Installation and Operation Manual
Explosion-Proof & FMS Refrigerator-Freezers
• Pour sealing compound down in between the two fiber rope dams filling the remaining space. Pour
• slowly, being careful not to trap air bubbles. Immediately wipe off any spilled sealing compound.
• Screw conduit domed-cover back onto conduit opening.
NOTE:
INITIAL SETUP OF SEALING COMPOUND WILL OCCUR IN APPROXIMATELY 30 MINUTES HOWEVER, THE
SEALING COMPOUND REQUIRES A
MINIMUM OF 8 HOURS ABOVE 32ºF
TO DEVELOP SUFFICIENT STRENGTH
TO WITHSTAND EXPLOSIONS.
Summary of Contents for 47747-222
Page 22: ...057 658 00 Rev B...