background image

V SERIES PROOFING CABINET 

 

F-41190 (02-16) 

 

  

10 

 

CLEANING 

 

 Always unplug 

electrical 

power supply before 

cleaning. 

 The Cabinet and its 

parts are HOT.  Be very careful when 
operating, cleaning, or servicing the 
cabinet. 
 
DAILY CLEANING:

 

1. 

Unplug electrical power supply. 

 
 

 
2. 

Allow warmer to cool before 

 cleaning. 
3. 

Clean the interior of the cabinet 

 

with a mild soap and water.   

 

Never use harsh chemicals or 

 

abrasive pads to 

clean

 

the

 

cabinet.

 

4. 

Rinse and dry with a soft dry 

 cloth. 
5. 

Clean the exterior of the cabinet 

 

with a clean damp cloth. 

 
 

 

 
 
HEAT TINT:

 

Darkened areas, called “heat tint,” may appear on stainless steel exposed to excessive 
heat.  Excessive heat causes the protective film to thicken.  This is unsightly, but is not 
a sign of permanent damage.  
 
 
 

 

LOCKOUT / TAGOUT PROCEDURE 

 

 

Always perform the Lockout / Tagout 

Procedure before removing any sheet metal panels or 
attempting to service this equipment. 
 
 

The Lockout / Tagout Procedure is used to protect personnel working 
on an electrical appliance.  Before performing any type of 

maintenance or service on an electrically operated appliance, follow these steps: 

 
1. 

In electrical box, place unit’s circuit breaker into OFF position. 

2. 

Place a lock or other device on electrical box cover to prevent someone from 
placing circuit breaker ON. 

3. 

Place a tag on electrical box cover to indicate that unit has been disconnected for 
service and power should not be restored until tag is removed by maintenance 
personnel. 

4. 

Disconnect unit power cord from electrical outlet. 

5. 

Place a tag on cord to indicate that unit has been disconnected for service and 
power should not be restored until tag is removed by maintenance personnel. 

Summary of Contents for ML-138089

Page 1: ...ipment com Vulcan 2016 All Rights Reserved F 41190 02 16 INSTALLATION OPERATION MANUAL V SERIES FOOD HEATED HOLDING PROOFER CABINET MODEL VP18 ML 138089 For additional information on Vulcan Hart or to...

Page 2: ...ED BY THIS MANUAL FOR YOUR SAFETY DO NOT STORE OR USE GASOLINE OR OTHER FLAMMABLE VAPORS OR LIQUIDS IN THE VICINITYOF THIS OR ANY OTHER APPLIANCE Improper installation adjustment alteration service or...

Page 3: ...CTION 3 INSTALLATION 3 4 ELECTRICAL REQUIREMENTS 5 OPERATION 6 CONTROLS 6 PROOFING OPERATING INSTRUCTIONS 7 DOUGH PREPARATION 8 PROOFING SHUTDOWN 8 HOLDING OPERATING INSTRUCTIONS 9 HOLDING SHUTDOWN 9...

Page 4: ...t proceed with unpacking and installation Contact your Vulcan Hart Customer Service Department immediately UNPACKING The Cabinet was inspected before leaving the factory The transportation company ass...

Page 5: ...terior of the unit Never use harsh chemicals or abrasive pads to clean the unit See cleaning instructions in this manual LOCATION For efficient cabinet operation choose a location that will provide ea...

Page 6: ...single phase operation All 110 120 volt cabinets are equipped with a 8 foot cord and NEMA 5 20 plug as standard equipment All 208 240 volt cabinets are equipped with an 8 foot cord and NEMA 6 15 plug...

Page 7: ...supplied to the cabinet and the cabinet is in Proofing Mode Thermostat The Thermostat turns power on to the heating elements If Proofing mode is desired the thermostat should be set in the red Proof...

Page 8: ...temperature and humidity The Cabinet and its parts are hot Be very careful when operating cleaning or servicing the cabinet At the proper setting your proofer door will have a light haze of moisture o...

Page 9: ...m refrigerator and allow the dough to reach room temperature Hint You may want to place the dough on a greased room temperature pan This helps shorten the proofing time Placing cold pans in the proofe...

Page 10: ...to preheat 5 Load Hot food pans with hot cooked food into cabinet 6 When removing items start at the bottom and work up This will keep food hotter and eliminate spillage onto lower items This cabinet...

Page 11: ...t damage LOCKOUT TAGOUT PROCEDURE Always perform the Lockout Tagout Procedure before removing any sheet metal panels or attempting to service this equipment The Lockout Tagout Procedure is used to pro...

Page 12: ...s not heat properly Door not shut properly or needs adjustment Check door seal and Contact Authorized Service Provider Defective element thermometer thermostat thermostat requires adjustment Contact A...

Page 13: ......

Page 14: ......

Page 15: ......

Page 16: ......

Page 17: ......

Page 18: ......

Page 19: ......

Page 20: ......

Page 21: ......

Page 22: ......

Page 23: ......

Page 24: ......

Reviews: