background image

2.  GETTING STARTED 

 

2.1 Inspection/Damage Claims 

 
a) Examine all components thoroughly as soon as received.  If damaged, write a complete and detailed description of 

the damage on the face of the freight bill.  Have the carrier's agent sign the description. 

 
b) Notify the delivering carrier of damage or loss immediately.  This may be done either in person or by telephone. 

Written confirmation must be mailed within 48 hours. 

 
c) Risk of loss or damage to merchandise remains with the buyer.  It is the buyer's responsibility to file a claim with 

the carrier involved. 

 
d) If you need assistance contact your distributor or the VST factory representative. 
 

2.2 Parts Verification 

 
Prior to starting work, make sure that all of the correct parts have been received. 
 
You will also need the following partial list of parts to complete the installation: 
 

1. Pulsers for each dispenser - 1, 10 , 100 or 500 pulses/gallon 
2. A Single Pole Double Throw (SPDT) or Double Pole Double Throw (DPDT) switch  
   activated by the dispenser handle. 
3. An Electric Reset (optional). 
4. A Junction box of sufficient volume for each dispenser. 

 

2.3 Return Shipping 

 
All return shipments of  VST products must be prepaid.  Return items in their original shipping containers. VST will 

accept no liability for damage caused by improper packing.  Address the shipment to: 

 

 Service Department

 

 VST Fuel Management, Inc.

 

                             2238 N. Los Alamos 

 

                             Mesa, Arizona  85213  

 

 

 

3.  SITE PREPARATION 

 

 

 

3.1 Mounting the VST Fuel S-810 

 

 

 

 

 VST, 2010

 

 

Summary of Contents for S-810

Page 1: ...ent contains information proprietary to VST Fuel Management Inc and shall not be disclosed duplicated or used for procurement design or manufacture without the expressed written consent of VST Fuel Ma...

Page 2: ...y precaution to prevent possible hazards which could result in serious bodily injury and property damage You are responsible for installing this product according to the instructions and warnings cont...

Page 3: ...rements 9 4 2 Wire Manufacturers 9 4 3 Dispensers Pumps 9 Table 1 Size of Dispenser Junction Box 10 b Interface wiring 11 c Dispenser wiring 11 Figure 4 Typical Wiring for 115Vac or 230 Vac VST Fuel S...

Page 4: ...on This manual provides a general description of various types of installations applicable to VST Fuel S 810 systems Installation shall be in accordance with National Electric Code NFPA 70 the Automot...

Page 5: ...Figure 1 Typical Installation of VST Fuel S 810 VST 2010 5...

Page 6: ...nsactions in memory for downloading The VST Fuel S 810 Fuel Management System has the capability of operating with a wide range of output devices which include printers modems personal computers and o...

Page 7: ...ry representative 2 2 Parts Verification Prior to starting work make sure that all of the correct parts have been received You will also need the following partial list of parts to complete the instal...

Page 8: ...d using either of two methods The first method is mounting the DET on the top of a 2 inch pipe x 55 approx height The DET is simply screwed onto the pipe and after being positioned for operation the t...

Page 9: ...Figure 2 VST Fuel S 810 Dimensions VST 2010 9...

Page 10: ...Figure 3 VST Fuel S 810 Pedestal Mounting VST 2010 10...

Page 11: ...end only AC wire size is to be minimum AWG 14 All wiring should be either color coded or numbered to facilitate connection of the wire ends CAUTION Do not use non moisture non oil proof or standard h...

Page 12: ...WARNING IN INSTALLATION AND USE OF THIS PRODUCT COMPLY WITH THE NATIONAL ELECTRICAL CODE FEDERAL STATE AND LOCAL CODES AND ANY OTHER APPLICABLE SAFETY CODES IN ADDITION TURN OFF POWER AND TAKE OTHER...

Page 13: ...rical Code to determine size of conduit required for the number of conductors b When possible install at least 25 percent spares for expansion and maintenance CAUTION NEVER RUN AC OR OTHER EQUIPMENT W...

Page 14: ...control This control may be implemented through the use of electrically operated solenoid valves 5 Pulser Wiring Each dispenser pump or hose to be controlled and monitored by the VST Fuel S 810 syste...

Page 15: ...signals CTS DCD RTS and DTR may be connected on a one for one basis if desired See Figure 13 The support of these signals is limited to providing the correct signal level for operation of the modem W...

Page 16: ...trol the correct pump When Diagnostic four is selected the display will change to the following SELECT PUMP When you press key 1 the display will change to the following 1 2 3 4 PUMPS The four pumps 1...

Page 17: ...l 810 power switch to the on position Put the VST Fuel S 810 into the keypad diagnostic mode as explained in the previous section Run the diagnostics for the display DIAG 1 and keypad entry DIAG 2 at...

Page 18: ...o the user at the location where the product is in use After the first ninety 90 days of the warranty period VST will repair or replace the product only if it is returned to the VST factory at the Tem...

Page 19: ...Fuel Management Inc in writing of any claims including claims of breach of warranty within thirty days after the facts upon which the claim is based are discovered or should have been discovered Fail...

Reviews: