Page
7
/
23
■ Controller Operation Method
①
Before turning on the controller power switch, please connect the head and
the controller using the connection cable.
②
Turn on the power switch on the rear panel of the controller. (Red lamp will be
lighted on the switch)
③
Power lamp will be turned on if the power is normally supplied.
④
[Interlock input]
By closing the DSUB I/O Connector pin 14 and 15 with
contact input on the rear panel of the controller, the ionizer is ready to be
irradiated. Check the interlock lamp status on the front panel of the controller.
(For the safety instructions, please refe
r to “1) Interlock Input Signal” on Page
11)