background image

--12-- 

3

 

"AGM  1    14.4 V"

 

Switch Position 

 

 

  U1=14.40 V  U2=13.50 V 
 

  1.5-5 h 

   

Adapted to closed, gas-tight 

 

AGM (absorbed glass mat)/lead-fleece 

 

batteries 

VRLA 

with indicated charging

 

voltage "

14.4 V

". 

 
 
 
 
 
 
 

4

 

"AGM  2    14.7 V"

 

Switch Position 

 

 

  U1=14.70 V  U2=13.60 V 
 

  1.5-5 h 

   

Adapted to closed, gas-tight 

 

AGM (absorbed glass mat)/lead-fleece-

 

batteries 

VRLA 

with indicated

 

voltage "14.7 V or 14.8 V". 
It is highly recommended to check the specification 
sheet of the battery concerning the high  
charging voltage U1 

14.7 V

 
 
 
 
 

Charging Programs for 

LiFePO4 Batteries: 

4 Characteristic lines, charging voltage rates and temperature control adapted to lithium batteries: 

 

 

Observe the instructions of the battery manufacturer! 

 

An operation of the unit at a LiFePO4 battery without BMS Battery Management System 
and without equalization charging of the cells (balancing) as well as safety circuit is not 
admissible! 

 

The battery temperature sensor must be installed at the battery (screw to the negative pole) 

and must be connected at the unit. It serves as protection for the battery.

 

No function without temperature sensor, LED 

"Main Charge" is flashing

 

If possible, the battery temperature should be kept above 0 °C. 

 
 
 

5

 

"LiFePO4   13.9 V"

 

Switch Position 

 

 

  U1=13.90 V  U2=13.90 V 
 

  0.5-1 h 

   

Adapted to 

 

Dometic "eStore" 

of the indicated capacity rates. 

Operation of the battery only with own BMS

 

and prescribed safety circuit! 
 
 

 

 

Summary of Contents for VCC 1212-50

Page 1: ...s excel by their compact design low weight high frequency switch mode technology and powerfully dimensioned power components for safe operation Significantly improved energy balance of the board batte...

Page 2: ...ng and fuses of the customer which are already existing in the vehicle Only suitable for VCC 1212 50 page 4 Suitable for combination with electroblock EBL EVS with the existing cabling of the customer...

Page 3: ...cross sections and lengths of the cables Never mix up the voltage sensor cables for start Vs and Vs and board Vb and Vb Insert fuses near the battery for protection of the cables Reverse battery 12 V...

Page 4: ...12 50 The cabling and the fuses for the electroblock EBL provided by the customer are further used VCC 1212 50 The switches IN Limit see table 3 page 14 can be used to eventually limit the maximum cur...

Page 5: ...50 70 90 with full capacity The cabling and the fuses for the electroblock EBL provided by the customer are further used For this purpose insert a switching relay 12 V 60 A order No 2202 into the cabl...

Page 6: ...y suitable for VCC 1212 50 The cabling with the fuses and the cutoff relay provided by the customer are further used VCC 1212 50 The switches IN Limit see table 3 page 14 can be used to eventually lim...

Page 7: ...to tables 1 The further cabling to the batteries including different cross sections is to be done directly at the relay The 12 V current requirement of the inverter might be higher than the output ca...

Page 8: ...ntioned maximum values for Cable Length BOARD are only used to approx 2 3 VCC 1212 50 Cable Cross section Cable Length START In case of insulated body Cable Length Batt Fuse 2 Cable Protection Cable L...

Page 9: ...ay in case of temporarily very high consumer current rates If not used leave the terminal blank The rating of the output is max 1 A and it is protected with a thermal fuse which resets itself after re...

Page 10: ...age rates of 20 C 25 C being recommended by the battery manufacturers LiFePO4 Batteries Installation The thermal contact of sensor and inside temperature of the battery should be well Thus it should b...

Page 11: ...temperature equalization for batteries in lead technology 1 Lead Acid Switch Position U1 14 40 V U2 13 50 V 2 6 h Universal charging program for acid lead acid batteries acc to DIN 57 510 VDE 0510 for...

Page 12: ...emperature control adapted to lithium batteries Observe the instructions of the battery manufacturer An operation of the unit at a LiFePO4 battery without BMS Battery Management System and without equ...

Page 13: ...U1 14 20 V U2 13 60 V 0 5 h Adapted to Victron LFP BMS 12 8 TransWatt TH 12 xxx of the indicated capacity rates Operation of the battery only with own BMS and prescribed safety circuit 7 LiFePO4 14 4...

Page 14: ...ging port for the starter battery is existing in the system the function auxiliary charging of the charging converter is not required and should be switched off A Switch position to the left A Auxilia...

Page 15: ...inuous signal at D without running engine might discharge the starter battery Increase of the charging capacity 12 50 V Reduction of the charging capacity 12 20 V Switching off threshold 12 00 V 30 se...

Page 16: ...ellow If it is on Pilot lamp for the starter battery during operation If it is flashing The voltage of the starter battery is too low or too high only with D control Is flashing shortly every 2 sec Du...

Page 17: ...uch as in EBL EVS bridges the charging converter Check connection plan Operation with EBL EVS etc m The charging converter changes permanently between active and quiescent condition D must arrive dire...

Page 18: ...ion phase After that automatic switching to the following phase U1 4 During the phase U1 LED Main Charge is lighting the battery voltage will be kept constant on a high level The green LED Battery Ful...

Page 19: ...ree from condensation water Never use the unit in locations where the risk of gas or dust explosion exists Open air operation of the unit is not allowed Lay the cables in a way that damage is avoided...

Page 20: ...Ah 100 460 620 Ah 150 600 800 Ah LiFePO4 Charging Programs Stored in the Memory 4 4 4 Safety Charging Voltage at Battery Overtemperature 12 80 V 12 80 V 12 80 V Input T T for Battery Temperature Sens...

Reviews: