CONNECT CONTROLLER LINE AND POWER LINE
First Start
After having assembled complete fan, connected power and controller lines,
give power to machine and wait about 30 seconds until it start to run, be-
cause machine need 30 seconds to autoset all parmeters.
After that check following:
•
No rotation unbalancing due to wrong components assembly
•
No noise coming out from machine
•
Motor led light every 2 seconds to test everything is fine
•
Fan Rotation must be clockwise, if seen from below the fan.