![Vollrath Stoelting DQU411 Series Operator'S Manual Download Page 25](http://html1.mh-extra.com/html/vollrath/stoelting-dqu411-series/stoelting-dqu411-series_operators-manual_1045864025.webp)
513687 REV.2
DQU411-I2 OPERATOR’S MANUAL
25
Section 3: Maintenance
MAINTENANCE
PA
R
T
S
TROUBLESHOO
TING
OPERA
TION
INTRODUCTION
Sanitize assembled machine as per instructions
outlined in Section 2 F.
B.19
Adjust the clear hose so that
it is not kinked and tighten the
clamp holding the hose to the
bag adapter.
B.17
Connect the air hose to the
tube at the back wall of the
cab and tighten the clamp.
Connect the other end onto
the tee and tighten the clamp.
B.16
Connect the low mix sensor
wires to the sensor
B.18