![Void Venu 10 V2 User Manual Download Page 20](http://html.mh-extra.com/html/void/venu-10-v2/venu-10-v2_user-manual_1044742020.webp)
Venu V2 Series User Guide V1.0
Page 20
7 Mounting
Tools required
• 6 mm Allen key
• 13 mm spanner/wrench
7.1 Installation safety
To avoid mechanical hazards, please note the following:
• Safety regulations vary in different regions. Full compliance with those
regulations must be your priority
• Rigging must only be undertaken by fully-qualified and experienced riggers who
understand local regulations
• This may include consulting a structural engineer before installation of wall brackets
• Remember that all personnel have a duty of care to themselves, to their assistants, to the
venue staff and to the public
• Before lifting any part of the system above head height, check the whole rig for loose tools
or other items that may fall and cause injury
• Do not use a telephone (even if hands-free) while rigging. Always concentrate fully on the
rigging operation
• Do not rig equipment that is worn, damaged, corroded, mishandled or over-stressed in any way
• Use only Void-approved mounting equipment and accessories
• Secondary safeties should be provided in all instances where cabinets are flying or fixing
overhead and should conform to local regulations