![Vogelsang FX116 Operating Instructions Manual Download Page 33](http://html.mh-extra.com/html/vogelsang/fx116/fx116_operating-instructions-manual_1044341033.webp)
Start-up
WBV.PU.003.EN FX116 V1.0
33
Sensors, safety
Have all safety devices been installed and is their proper functioning ensured?
Are the safety devices or maintenance switches easy to reach?
Put the pump into operation and check inlet and outlet pressure, speed and capacity.
7.2
Checks after start-up
20 hours after start-up
, perform the maintenance intervals in
Chap.
“Maintenance plan”.
This includes checking the tightening torque of the hexagon head bolt.
Tightening torque
M 12 hexagon head bolt, 12.9: 140 Nm