
DE
MAINTENANCE
Maintenance work on the fan must be carried out after 6 months at the latest.
Maintenance steps:
• Disconnect the fan from the power supply and ensure that the power is switched off (Fig. 14).
• Remove the front cover and clean the fan with a soft cloth or brush (Fig. 15).
• Rinse the cover under running water (Fig. 16).
• Wipe the surfaces of the fan dry.
• Put the cover back on the fan.
• Connect the power supply (Fig. 17).
WARNING! The electrical components must be protected from splashing water!
STORAGE AND TRANSPORT REGULATIONS
• Store the device in the original packaging in a ventilated room at a temperature of +5 ° C to + 40 ° C and a
relative humidity of max. 70%.
• Vapors and foreign substances in the air, which can cause corrosion and damage connection seals, are not
permitted.
• Use lifting gear during cargo handling work to prevent possible damage.
• The transport requirements for this type of cargo must be met.
• The transport with vehicles of any kind must be carried out under constant protection from harmful mechanical and
weather-related influences. Only transport the device in the operating position.
• Carry out loading and unloading work carefully, protect against impacts.
• Before using the device for the first time after transporting it at low temperatures, it must be kept at room
temperature for at least 3-4 hours.
9
Summary of Contents for 100VAIR
Page 1: ...DE AXIAL FAN OPERATING MANUAL 100VAIR www vlano de ...
Page 12: ...DE 39 77 175 140 67 50 ø99 221 188 123 1 55 2 12th ...
Page 13: ...DE LN A QF OUT 3rd 4th 5 6th 7th 8th A OUT 9 10 11 13 ...
Page 16: ...DE LN A QF OUT 14th 15th A OUT 16 17th 16 ...
Page 17: ...DE 17th ...
Page 18: ...DE 18th ...