Installation requirements
Check the strength and level of the installation ground so that the unit may not cause
any vibrations or noise during the operation.
In accordance with the foundation drawing in the figure, fix the unit securely by means
of foundation bolts. (Prepare four sets each of Φ10 Expansion bolts, nuts and washers
which are readily available in the market.)
Screw in the foundation bolts until their length is 20 mm from the foundation surface.
Drain hole position
Fig 6‐3
Fig 6‐4
Φ10 Expansion
bolt
Rubber shocking
proof mat
Solid ground
or roofing
Concrete basement
h≥100mm
Drain hole
Drain hole
This drain hole is covered by rubber
plug. If the small drain hole can not
meet the drainage requirements, the
big drain hole can be used at the
same time.
4/6 wW
8/10 kW
Fig. 6‐5
CAUTION
It's necessary to install an electrical heating belt if water can't drain out in cold weather
even the big drain hole has opened.
It is suggested to site the unit with the base electric heater.
Summary of Contents for HPS-22CH65AERI/O1 R32
Page 2: ......
Page 53: ...VIVAX HR 50 DODATAK B Dijagram ožičenja s električnim upravljanjem 4 10kW ...
Page 57: ...VIVAX HR ...
Page 58: ... HR VIVAX 1 ...
Page 89: ...VIVAX HR 32 STRUKTURA IZBORNIKA PREGLED ...
Page 90: ... HR VIVAX 33 ...
Page 145: ...VIVAX ENG 50 ANNEX B Electrically controlled wiring diagram 4 10kW ...
Page 149: ...VIVAX ENG ...
Page 150: ... ENG VIVAX 1 ...
Page 181: ...VIVAX ENG 32 MENU STRUCTURE OVERVIEW ...
Page 182: ... ENG VIVAX 33 ...
Page 187: ......
Page 205: ...3 4 3 4 3 4 ...
Page 208: ...ZZZ 9 9 FRP ...