Installat on of Monoblock Bathtubs
1
4
7
10
11
12
8
9
5
6
2
3
1-2 Bathtub must be carr ed ups de down. It must never be carr ed by hold ng from ts panel
3- In th s ser es a ‘h dden overflow’ s nstalled to pla n and hydro massage bathtubs by the manufacturer. Therefore the product comes w th the
s phon nstalled. The bathtub s placed on the nstallat on area and the per meter of ts bottom s marked. Ins de the marked area, the 50
mm d ameter waste water dra n p pe s nstalled from the center shown n the draw ng, at the po nt nd cated by the letter “A”, and the water
nlet p pes are nstalled to the centerl ne of the faucet above the bathtub, at the po nt nd cated by the letter “C", as llustrated n the techn cal
d agram. If th s s a hydro massage (hydro massage) bathtub, a 220 V phase, neutral and earth electr c l nes are requ red to be connected
ns de the marked area, n accordance w th the or entat on of the bathtub (seethe area nd cated by the letter “E").No water dra n muff should
be left n the area nd cated by the letter “B”. External faucet appl cat on should be carr ed w th a m n mum d stance of 100mm to the bathtub
and n accordance w th the bathtub placement. The axle d stance between the hot and cold water nlet p pes should be adjusted n
accordance w th the techn cal draw ng of the faucet. (See the Techn cal Data Sheet for the techn cal scheme).
7- The parts of the bathtub’s monoblock s des that touch the floor should be marked. The panel support ng brackets should be pulled ns de at
the th ckness of the acryl c and they should be fixed to the floor w th s l cone. Accord ngly, movement of the bathtub on the floor s
prevented.
8- The s phon dra n p pe connect on and also the electr cal connect on ( f the product s hydromassage) of the bathtub should be made
9- T ghten the leg set nuts.
10- Apply s l cone on the bathtub legs’ parts wh ch contact the floor.
11- When the nfrastructure nstallat on s completed the taken down from the bear ng supports. When deemed necessary apply s l cone to
several po nts between the bathtub panel and the floor and complete the nstallat on
12- The nstallat on of the monoblock bathtub s completed. Any rema n ng protect ve fol o on the bathtub should be removed only after the
bathtub nstallat on and any other construct on works n the bathroom are fin shed.
4-5 The bathtub s taken nto level us ng a scale at the nstallat on area.
6- For the nfrastructure nstallat on, the bathtub s placed on bear ng supports at the nstallat on area.
Caut on: Dur ng the nfrastructure nstallat on, the bathtub should not be t lted s deways and no we ght should be placed on ts s de panels.
6
Summary of Contents for K-5900573
Page 1: ...ACRYLIC HYDROMASSAGE BATHTUBS User Manual ...
Page 20: ......