3
1
2
" [89mm]
PLACE THE THIRD AND FINAL STRAPPING ASSEMBLY AT THE VERY TOP OF
THE ROOF AS SHOWN. ATTACH TO THE ROOF WITH 2 1/2" SCREWS, USE TWO
INTO EACH RAFTER AND ONE INTO THE RIDGE BETWEEN EACH RAFTER AS
SHOWN.
SECTION VIEW
2 1/2" ROBERTSON SCREWS
24 req
B
Mt. ORFORD
0041_Mt_Orford_11x14_Instructions_V1.1
TOLL FREE: 1-877-795-7423
EN
STEP 21