PEEL AND APPLY PUTTY TAPE (DC 2034) TO THE TOP OF THE RIDGE
BEAM (DC 1393)
PUTTY TAPE SHOULD BE APPLIED NEAR THE EDGE OF THE RIDGE
BEAM AS SHOWN IN
DETAIL 1
BE SURE TO APPLY PUTTY TAPE TO THE ENTIRE LENGTH AND TRIM
TO FIT.
PUTTY TAPE
DC-2034
DETAIL 1
DC-2034
DC-1393
THIS STEP WILL REDUCE THE CHANCE
OF WATER ENTERING THE STRUCTURE
PREVENT WATER DAMAGE
Mt. ORFORD
0041_Mt_Orford_11x14_Instructions_V1.1
TOLL FREE: 1-877-795-7423
EN
STEP 20