1" ROOF SCREWS
12 req
BARCELONA
0225_BarcelonaAC_Instructions_V4.0
TOLL FREE: 1-877-795-7423
EN
STEP 35
PLACE THE RIDGE CAP (DC 2172) AT THE VERY TOP OF THE ROOF OVER TOP OF
THE ENDS OF THE HIP FLASHING. AS SHOWN.
SECURE THE RIDGE CAP WITH SCREWS ON EACH SIDE THROUGH THE CAP AND
INTO THE ROOFING. MAKE SURE THE CAP IS PRESSED DOWN TIGHT AND FLAT TO
THE ROOFING.
DC-2172
I
SCREWS MUST BE FASTENED
THROUGH THE TOP RIBS OF THE
ROOFING SHEET ONLY.