Machine Setup
13
© 2020 Vision Engraving & Routing Systems
2.2.3
Connections
The Main Power Switch is located on the left side of the VR48.
The main power supply is connected to the Main Electrical Box on the left side of the VR48. Remove the
cover (if installed) and make the connections as shown below. Ground is connected to the bare wire and
common leads are connected to the two shielded wires. The supply for this connection is Junction Box
#1 (220 VAC, Single Phase). NOTE: If the 5 hp router spindle is purchased, 220 VAC, Three Phase
power is needed).
Note: The picture below is for illustration purposes only. The power cable should enter the Main Electrical
Box through the hole in the left side of the box as shown in the above picture.
Summary of Contents for VR48 5 Series
Page 8: ...Vision VR48 8 2020 Vision Engraving Routing Systems 2 Machine Setup 2 1 Layout Diagrams...
Page 9: ...Machine Setup 9 2020 Vision Engraving Routing Systems 2 1 1 VR48 T Slot table...
Page 10: ...Vision VR48 10 2020 Vision Engraving Routing Systems 2 1 2 VR48 Vacuum table...
Page 14: ...Vision VR48 14 2020 Vision Engraving Routing Systems...
Page 16: ...Vision VR48 16 2020 Vision Engraving Routing Systems...
Page 18: ...Vision VR48 18 2020 Vision Engraving Routing Systems...
Page 20: ...Vision VR48 20 2020 Vision Engraving Routing Systems...
Page 28: ...Vision VR48 28 2020 Vision Engraving Routing Systems...
Page 35: ...Machine Setup 35 2020 Vision Engraving Routing Systems Select Step 1 Setup Machine...
Page 53: ...Machine Setup 53 2020 Vision Engraving Routing Systems...
Page 54: ......