It is highly recommended that the computer being used to operate the Vision machine be connected to
the internet. This will allow a Vision Technical Support representative to connect remotely to assist
when needed.
NOTE:
This is only a recommendation and is not needed for daily use of the Vision equipment.
2.2.1
Electrical Requirements
1.
A qualified and licensed electrician must be used to complete all wiring and grounding of the
machine according to all state, local, and national electrical codes.
2.
Make sure all Junction Boxes and Outlets are mounted according to all state, local and national
electrical codes.
3.
Junction Box #1 (50 Amp, 220 VAC, Single Phase for 3 HP router motor
OR
50 Amp, 220 VAC,
Three Phase for 5 HP router motor) will power the router table, spindle, and controls. It is typically
mounted on Wall A, approximately 36 to 48 inches above the floor surface. The box should be level
with the left edge of the router table. (Refer to Installation Layout Diagrams).
4.
Junction Box #2 - for machines equipped with Vacuum Tables ONLY - (30 Amp. 220 VAC, Single
Phase) will power the Vacuum Pump. Mounting should be on Wall A and between 36 inches and 48
inches above the floor surface. If locating the vacuum pump as shown (Refer to Installation Layout
Diagram), locate Junction Box #2 no greater than 4 feet from Junction Box #1. Junction Box #2 can
also be another outlet if you are using the plug supplied with the vacuum unit - check all local, state,
and national electrical code.
5.
Outlet #1 (20 Amp, 220 VAC, Single Phase) should be mounted on Wall A as shown (Refer to
Installation Layout Diagram - Section 2.1). This can also be another Junction Box if the Dust
Collector is to be direct wired to its electrical source. The dust collector is approximately 2 feet x 3
feet and is on wheels.
6.
Outlet #2 (15 Amp, 110 VAC, Single Phase) should have multiple standard three prong sockets for
the computer. It is typically located near the bottom left corner of the router table (home position) as
shown (Refer to Installation Layout Diagram).
7.
Wiring needs to be completed to the junction boxes, outlets, etc. before the scheduled first
installation/machine orientation day.
Summary of Contents for VR48 5 Series
Page 8: ...Vision VR48 8 2020 Vision Engraving Routing Systems 2 Machine Setup 2 1 Layout Diagrams...
Page 9: ...Machine Setup 9 2020 Vision Engraving Routing Systems 2 1 1 VR48 T Slot table...
Page 10: ...Vision VR48 10 2020 Vision Engraving Routing Systems 2 1 2 VR48 Vacuum table...
Page 14: ...Vision VR48 14 2020 Vision Engraving Routing Systems...
Page 16: ...Vision VR48 16 2020 Vision Engraving Routing Systems...
Page 18: ...Vision VR48 18 2020 Vision Engraving Routing Systems...
Page 20: ...Vision VR48 20 2020 Vision Engraving Routing Systems...
Page 28: ...Vision VR48 28 2020 Vision Engraving Routing Systems...
Page 35: ...Machine Setup 35 2020 Vision Engraving Routing Systems Select Step 1 Setup Machine...
Page 53: ...Machine Setup 53 2020 Vision Engraving Routing Systems...
Page 54: ......