STEP 4 : SHELVES
Open box V4S or
V4D
Hook
SHELVES
into hangers starting
from the bottom of cabinet, (12
shelves on cooling unit side, 14 on
the other) alternating the two sides
HINT :
1
2
Snap
SHELVES
into
hangers on one side
Push the
SHELVES
down to snap into
opposite side hangers
3
3
1
2
PRESS
BOTTOM
TOP
1
2
Install
COUPLER SHELVES (L)
between the
VERTICAL COUPLER
and the
BACK PANEL
, hook them on
the
COUPLER HANGERS
(J)
Install 4
HANGERS STRIPS
(M)
,
hook-
ing them to the
COUPLER SHELVES
through square holes. (Watch for ori-
entation, all hooks have to point
upwards).
NOTE :
Assure that each of them is
hooked to all 4 shelves
1
2
COUPLER SHELVES
VERTICAL COUPLER
J
L
M
L