background image

O

S

IL

IC

O

N

E

CO

VER

PLA

TE

BAC

K

Feed  the  power  cord  through  and 

Screw  the

  COVERPLATE

  to  the 

COOLING  UNIT

  at  each  corner

(screws  supplied  with  cooling  unit)

NOTE : 

Snap in  the 

AIR DEFLECTOR

, place  

bottom  tabs,  push,  then  ex  onto 

side and let it  sping back into side tab

 

PHO

NEBO

OK

57

1 ou

t 2

Drob

ot co

ntrols

ADJU

ST

1

2

3

4

5

6

7

1

2

COOLING

UNIT

6

5

AIR

DEFLECTOR

Lift the 

COOLING UNIT

 to top shelf

NOTE :

Take  out  the  power  cord    through  the 

BACK 

panel 

Slide  the  unit  forward  into  the 

BACK 

PANEL

 opening and lock the 

 2 KEYHOLE 

TABS 

(O)

over the 2 

HANGER POSTS 

(P)

*

* PART OF THE UNIT AND THE 

   TOP PANEL

OPTIONAL: Seal all panel joints (indicated 

by grey arrows) with the supplied silicone 

(O).

STEP 5 : COOLING UNIT INSTALLATION

1

2

3

3

P

O

Do  not  overtighten  the 

screws,  cover  should  seal 

but  the  metal  should  not 

touch the cabinet

6

5

 

Place it on a spacer (phone-

book or pieces of left-over 

insulation)  to  get  it  level 

with the cut-off of the 

BACK 

panel

4

4

In case of excessive condensation attach the supplied drain 

hose  and  direct  it  to  a  cup  or  container  (check  and  empty 

regularly). The hose can be cut down to a desired size to t 

into the drain cup or container.

NOTE:  The  hose  should  be  used  if  excessive  condensation 

occurs and at your option, remove if it is not required.

7

7

Summary of Contents for Tuscany 250

Page 1: ...TUSCANY 2 5 0 5 0 0 WINE CELLAR ASSEMBLY OPERATION MANUAL...

Page 2: ...hed basements laundry rooms breezeways closets or any unventilated room In other words these units must be installed in air conditioned environments which do not trap the warm air being exhausted C Te...

Page 3: ...ase and Legs Installation D E F G H I 4 Shelves L M 5 Cooling Unit Installation 6 Faceplate and Light Installation N 7 Doors Installation F G H I C Coupler Hanger J Screw Coupler Shelf Hanger Strips L...

Page 4: ...V6S TOP or V6D TOP Install connector CLIPS A with silver clip SCREW B in BACK PANEL S and TOP PANEL S predrilled holes Continue with box V6S BOTTOM or V6D BOTTOM Open box V5 or V2 and continue the ins...

Page 5: ...ust point towards top NOTE Gradually tighten the screws until the panels are tight Align TOP of SIDE PANEL open end of hooks must point towards top with TOP of BACK PANEL Push SIDE PANEL rmly down war...

Page 6: ...PANEL can be identi ed by two hangers HANGER POSTS P RUBBER ONLY 5 6 Insert VERTICAL COUPLER in front of the cabinet Part of the TOP PANEL Be sure that all PANELS are fully inserted and all CLIPS A a...

Page 7: ...arrows with the supplied silicone O Continue in steps 5 and 7 Fasten one HINGE G to each SIDE of the cabinet NOTE Fasten FRONT BASE D to the BOTTOM of the cabinet Use HEX BOLTS H and HEX WRENCH I 2 G...

Page 8: ...SHELVES down to snap into opposite side hangers 3 3 1 2 PRESS BOTTOM TOP 1 2 Install COUPLER SHELVES L between the VERTICAL COUPLER and the BACK PANEL hook them on the COUPLER HANGERS J Install 4 HANG...

Page 9: ...ver the 2 HANGER POSTS P PART OF THE UNIT AND THE TOP PANEL OPTIONAL Seal all panel joints indicated by grey arrows with the supplied silicone O STEP 5 COOLING UNIT INSTALLATION 1 2 3 3 P O Do not ove...

Page 10: ...s down on ends of light behind to release cover 2 Remove cover as light ends are pushed down ON OF F ON OF F 1 2 J 1 2 3 4 5 6 7 FACEPLATE 2 2 1 1 1 1 2 Open the RUBBER RING N at cut end and place it...

Page 11: ...2 3 4 5 6 7 1 2 3 4 5 6 7 1 2 3 4 5 6 7 S IL IC O N E Install TOP HINGES G with HEX BOLTS H NOTE Adjust nal position of the doors before tightening the bolts STEP 7 DOORS INSTALLATION Open box V3 Pla...

Page 12: ...stores the request Press and hold for 5 sec until the unit stops and stores the request Press and hold for 5 sec until the unit stops and stores the request The unit will restart after 1 minute in th...

Page 13: ...er Tuscany wine cellars are illustrated below Note the variations in shelf height to accomodate the widest variety of bottle types and sizes Standard Burgundy and Bordeaux bottles are best arranged wi...

Page 14: ...the storage temp properly set Is the cabinet properly assembled with all joints air tight Is the door properly adjusted to seal tightly when closed Is air ow to and from the cooling unit unobstructed...

Page 15: ...d fans Also you must take steps to protect the unit from sudden power surges As with any sensitive electronic device your Vintage Keeper unit may be damaged by power surges or spikes including lightni...

Page 16: ...5648 McAdam Rd Mississauga ON CAN L4Z 1T2 Phone 905 501 8582 Fax 905 501 0889 Toll free 1 888 274 8813 customerservice vintagekeeper com www vintagekeeper com TUSCANY 2 5 0 5 0 0 WINE CELLAR...

Reviews: