12
904107 REV C 4/13/15, INST 69 FIREBIRD w/o AC CNTRL PNL PG 12 OF 17
Plug
From
Control
Wiring
Harness
232002-VUA
From
Control Panel
Plug
From
Wiring
Harness
232001-VUR
1.
Using the supplied tie wraps, tie the wires and the unused wire to the control panel. Confirm that wires are
secure and do not interfere with lever operation or slide pot assembly.
2.
Install control panel from behind dash.
NOTE: Make sure slide pot assemblies clear duct hose behind
the left side of dash opening. Do not force the control panel into the dash. Forcing the control
panel in to the dash will damage slide pot assemblies and/or duct hose.
3.
Plug the wiring harness into the ECU module on the sub case (See Figure 11, below).
4.
Wire according to wiring diagram on Page 15.
5.
Calibration procedure and operation instructions:
A.
Calibrating the control panel will set the range of travel for the slide pots connected to the OEM control
panel levers. Performing this procedure will set the limits of the slide pots at their highest and lowest
points.
B.
Locate the gray wire with an unused connector in the wiring harness near the two cable harness relays.
This wire is labeled
PRGM
on the wiring diagram on Page 15.
C.
It will be necessary to ground the gray wire for approximately five seconds while moving the controls, so it
is sometimes helpful to attach one end of the white jumper wire to the vehicle’s ground (for example, the
chassis) and have the other end ready to connect to the gray PRGM wire when the procedure requires it.
D.
To calibrate the control panel, follow the calibration procedures on Pages 13 & 14.
Final Steps
Figure 11
Summary of Contents for Firebird 1969
Page 17: ......