-14-
Installer’s Instructions
WARNING
Do not use a ground fault interrupter (GFI). A
dedicated circuit is required.
WARNING
•
Always check wiring harness connections before initiating any test procedures.
•
Disconnect electric power from the appliance before performing any
maintenance or repairs.
•
Voltage checks should be made by inserting meter proves beside the wires in
the connector blocks with the electric power source on and the connector block
plugged in.
•
Resistance checks should be made on components with the electric power off
and the connector block disconnected.
Federal law requires that WINE~MATE split cooling systems be
installed by an EPA certified refrigeration technician.
1. General Instructions
WINE~MATE split system is shipped as components and is ready for use only after
a certified refrigeration technician has properly installed the system. Proper
installation is critical. Vinotemp can only warrant the quality of the components.
The installation and proper operation of the system must be warranted by the
installer. Installation of the system must be done in accordance with all state and
local building and electrical codes.
The condensing unit and evaporator unit are connected by a liquid line and an
insulated suction line that are supplied by the installer. These lines must be
properly sized for the distance between the two units. After the units and lines
are connected, the system must be checked for restriction, pressurization and leak.
Then the system must be evacuate and charged with refrigerant. Refrigerant
amount will vary depending on the length of line set.
Parts included:
Temperature Controller
Evaporator Unit (liquid line solenoid valve and expansion valve are installed)
Condensing Unit (pressure control, water regulation valve, discharge and suction
valves and installed)
Liquid Filter
Liquid Indicator