3- Risk assessment
Before starting to install the automatic gate/barrier system it is necessary to evaluate all possible points of danger during the movement of the gate/barrier
Fig. 2 highlights some of the danger points of the gate/barrier.
Before starting installation you need to check that the gate/barrier slides properly, that there are secure mechanical stops and check the gate/barrier support
system.
4- Electrical wiring harnesses
A - Crushing
B - Conveying
C - Shearing
Key:
1 - Photocells
2 - Selector
3 - Flashing light
4 - Gear motor
5 - Rack
230 V~
C
B
A
A
B
1
1
3
2
3 x 0,5 mm
2
2 x 1 mm
2
4 x 0,5 mm
2
2 x 0,5 mm
2
3 x 1,5 mm
2
5
4
Fig. 2
Fig. 3
A - Impact and crushing
B - Shearing, conveying and cutting
C - Raising
B
C
A
3 x 1,5 mm
2
3
1
1
2
2 x 0,5 mm
2
3 x 0,5 mm
2
2 x 0,5 mm
2
2 x 1 mm
2
EN