4.4 BATE-R010 Three-phase - Power
≥
18kW
3 phases power supply
airflow
controller
auto
reset
manual
reset
Command signal
according to NF C 15-100 standard
Safety
thermostat
0...10Vcc
400V 50Hz
L1
L2
50°C
θ
100°C
θ
B
C
PTC
BATE R010
PF
9
6
5
10
L3
N
L1
L2
L3
N
In any case, it must not be possible to shut off the fan without the heater shutting off beforehand (MCR1-
type post-ventilation delay if necessary) or at the same time (to be avoided),
Post-ventilation block diagram
BDEZ
Safety thermostats
fitted within the heater
MCR1
Fan ON/OFF
Power
supply
Coil supply
KM10
∆P
T1
A2
18
A1
N
Y1
L
15
230VAC 50Hz power supply
Main ON/OFF
post-ventilation delay
airflow controller
5.
COMMISSIONING AND MAINTENANCE
5.1 Normal operation
Before start-up, the heater must be connected to the network and the cover must be closed,
The fan must be operational,