_________________________________________________________________________________________
Vigilant Inc. | 85 Industrial Park Drive | Dover, NH 03820 | (888) 812-4427 | vigilantinc.com
Page: 4
Vigilant Sentinel 250 Wall Humidor
Installation Instructions
1. Measure the cabinet, and roughly locate where you would like to hang the cabinet, before marking the wall.
2. Measure up from the floor 69” and gently mark the wall with a pencil.
3. Use the level to determine a level line at 69” above finished floor and gently mark the wall.
Note:
This is the line that the bottom edge of the wall mounted z-clips will be placed. This will also result in
the bottom of the humidor being +/- 36” off the finished floor.