Installation
74
Connection of Low Water Cut-off Device (CM2 only)
1.
Remove jumper between terminals
21 and 22.
2.
Make connection as shown in
diagram.
5
3
5
1
3
3
8
v
1
.8
Please note that the diagram shown
is only a simplified conceptual
drawing of a typical low water
cut-off (LWCO) device. Refer to the
manual specific to the device for
interconnection details.
CAUTION