9
Commissioning steps
Inspection steps
Maintenance steps
Page
•
•
1. Adjusting the pressure regulator and safety pressure limiter
....................................... 10
•
•
............................................................................................... 10
•
•
................................................................................................. 11
•
•
5. Closing the draught stabiliser (if installed)
..................................................................... 11
•
6. Opening the boiler door and cleaning cover
................................................................... 11
•
7. Removing and cleaning the turbulators
........................................................................... 12
•
8. Cleaning the heating surface, flue outlet and flue
.......................................................... 13
•
•
9. Checking all gaskets and packing cords on the flue gas side
•
10. Checking the thermal insulation components on the boiler door
•
•
12. Securing the boiler door and cleaning cover
.................................................................. 14
•
13. Checking the water chamber for deposits
....................................................................... 15
•
14. Cleaning the multiple level electrode
............................................................................... 15
•
15. Cleaning the water level indicator
.................................................................................... 16
•
16. Checking the hydraulic connections for leaks
................................................................ 16
•
•
17. Cleaning the sight glass in the boiler door
...................................................................... 16
•
•
18. Checking the Vitoair draught stabiliser (if installed)
...................................................... 17
•
•
•
•
................................................................................................. 17
•
•
•
21. Checking the pressure switch function
........................................................................... 17
•
•
22. Checking the safety and control equipment
•
23. Checking the pressure regulator, safety pressure limiter and temperature
•
24. Checking the water quality
................................................................................................ 17
•
•
25. Checking the thermal insulation
•
•
26. Checking the installation room ventilation
•
•
27. Checking the flue for tightness
•
28. Operating and service documents
................................................................................... 18
Commissioning, inspection, maintenance
Steps - commissioning, inspection and maintenance
5692729