Control Connections
46
Installing the Programming Unit of the Control Unit
Please note:
The control unit comes packaged
separately.
1.
Slide control unit onto rails on both
sides of the electrical connections
unit and snap into place.
Electrical connections of individual
components of the programming unit
are made automatically upon
insertion of the programming unit
into the control base.
Do not kink the capillaries of
manometer.
2.
Lock hinges on each side.
3.
Attach junction box cover
(circulation pumps).
4.
Attach base panel.
5.
Attach front enclosure panel.
6.
Secure in place by rotating slotted
screw.
5285
960
v1
.2
2.
4.
1.
3.
1.
IMPORTANT
6.
5.
Summary of Contents for Vitodens 200 WB2 11-44
Page 51: ...51 5285 960 v1 2...