14
Cleaning the sight glass in the boiler door
A
B
Check gaskets
A
and hose connection
B
for leaks.
Closing the boiler door
1.
Tighten the screws on the boiler door
evenly and diagonally.
2.
Install the gas supply pipe and check
for tightness.
Checking the thermal insulation
Check the thermal insulation fit and re-
align if required.
Checking the mixer for ease of operation and leaks
1.
Remove the motorised lever from the
mixer handle.
2.
Check the mixer for ease of opera-
tion.
3.
Check the mixer for leaks. Replace
the O-rings if the mixer leaks.
4.
Snap the motorised lever into place.
Commissioning, inspection, maintenance
Further details regarding the individual steps
(cont.)
5692 909 GB
Summary of Contents for Vitocrossal 300 CT3 SERIES
Page 20: ...20 202 203 087 090 206 207 207 207 230 230 093 Parts lists Parts lists cont 5692 909 GB...
Page 21: ...21 C 237 216 208 234 220 209 210 222 217 Parts lists Parts lists cont 5692 909 GB...
Page 24: ...24 087 086 087 086 081 080 084 083 Parts lists Parts lists cont 5692 909 GB...
Page 33: ...33 5692 909 GB...
Page 34: ...34 5692 909 GB...
Page 35: ...35 5692 909 GB...