Vitocell 300-W/V, EVIA/EVIB Installation, Operating and Service
42 and 53 USG (160 and 200 L) Tank Installation
Installation
Tank levelling
1. Level the DHW tank with its leveling bolts.
IMPORTANT
Do not extend the leveling bolts beyond an overall
length of 1½ in. (35 mm).
IMPORTANT
Never wrap insulating tape around the sensor.
1. Remove cover screw and remove top cover.
2. Route the sensor cable through the strain relief to
the sensor well.
3. Attach the strain relief to the sensor well.
4. Push the DHW #5 or temperature controller sensor.
to the bottom of the well.
5. Snug the strain relief screw. Do not overtighten to
damage the cable.
6. Insert the thermometer sensor
B
into tank cap hole
and secure with the wing nut.
Temperature sensor installation (when using Viessmann
controls).
IMPORTANT
Due to the length of the stainless steel well 17
f
in.
(449 mm), care must be taken to ensure that the sensing
bulb of the sensor is inserted and pushed to the end of
the stainless steel well.
7. Reinstall top cover and secure with top cover screw.
Note:
The tank comes with insulation jacket installed.
The temperature sensor well is installed and will
accept a supplied Viessmann 10K NTC sensor
with a Viessmann boiler or Viessmann control.
Note:
For control by others the sensor bulb should be
a
in. (6 mm) in diameter or cut out opening
A
on
the flange insulation and push the high limit safety
cut-out
sensor
B
into the clamping bracket and
secure with supplied wing nut.