12
5813 312 - 01
Vitocell 300-W/V, EVIA/EVIB Installation, Operating and Service
Installation
119 USG (450 L) Tank Installation
(continued)
Fitting the thermal insulation jacket
Note:
H
Ensure that no fleece remnants enter the DHW
tank through the tank connections.
H
2 people are required for the following work.
1. At the back of the tank: Attach 6 clip fastenings
to the edges of the right and left sections of the
insulation jacket and lay the thermal insulation
jacket around the tank body.
Note:
Leave the clip fasteners in the first notch.
2. At the front of the tank: Attach 6 clip fasteners
to the edges of the right and left sections of the
thermal insulation jacket.
3. Push the clip fasteners at the back of the tank
as close together as possible.
4. Push the clip fasteners at the front of the tank
as close together as possible.
Fitting the cover strips
1. Fit the thermal insulation jacket evenly around the
tank body by patting it.
2. Mount the front cover strip and flange cover.
3. Fit the rear cover strip.