10
5813 312 - 01
Vitocell 300-W/V, EVIA/EVIB Installation, Operating and Service
79 USG (300 L) Tank Installation
Installation
Fitting the flange cover
Installing the sensor well and the cylinder temperature sensor
Note:
The sensor retainer is in the sensor well.
1. Remove the sensor retainer.
2. Fit the sensor to the outside of the sensor retainer
contact spring (not in the groove).
Note:
The sensor must sit flush with the front of the spring.
3. Insert the sensor retainer with sensor into the
sensor well as far as it will go.