3
Installation requirements ........................................................................
Installation preparations .........................................................................
Drain outlet positioning .......................................................................
Fitting the sub-mounting kit ....................................................................
Fitting connection pipes ......................................................................
Connecting the heating circuits ..............................................................
Connecting heating circuits with permeable pipework ........................ 10
Connecting the mixer control to the boiler control unit ....................... 11
Commissioning and adjustment ............................................................. 11
Filling and commissioning the heating system ................................... 11
Venting the heating circuit with mixer ................................................. 11
Position of switch on the mixer motor ................................................. 12
Adjusting the flow rate ........................................................................ 12
Adjusting the bypass .......................................................................... 13
Connection and wiring diagram ............................................................. 14
Index
5785 284 GB
Summary of Contents for Sub Mounting Kit
Page 15: ...15 5785 284 GB ...