34
Note
The reports can be used as templates.
Commissioning
Maintenance/service
Maintenance/service
Date:
By:
Maintenance/service
Maintenance/service
Maintenance/service
Date:
By:
Maintenance/service
Maintenance/service
Maintenance/service
Date:
By:
Maintenance/service
Maintenance/service
Maintenance/service
Date:
By:
Maintenance/service
Maintenance/service
Maintenance/service
Date:
By:
Start-up report
The report can be used as a template.
Serial number
Date
Start time
!
Please note
Fill in and keep the report for each cold start in accordance with the engineering information "Vitomax cold
and warm starts in shell boilers".
Start-up reports are a prerequisite for verifying the warranty.
Commissioning/service reports
Reports for commissioning, inspection and maintenance
6152553
Appendix
Summary of Contents for M22
Page 39: ...39 6152553 ...