Preparing for commissioning
Only for an initial start
‐
up with Vitotronic 300, type GW2
Check that the safety temperature limiter of the control unit is not set above
110 °C; adjust to max. 110 °C, if required.
Safety equipment block for 72 to
96 kW version
Safety equipment block for 108 to
144 kW version
A
Pressure gauge
1.
Check that the boiler room ventila-
tion aperture is open.
2.
Check the inlet pressure of the dia-
phragm expansion vessel.
If it is lower than the static system
pressure, top up with sufficient
nitrogen to raise the inlet pressure
above (0.1 to 0.2 bar) the static
system pressure.
3.
Open any installed check valves.
Further details regarding the individual steps
6
Initial start-up, inspection, maintenance
5692
647
GB
Summary of Contents for GS1B
Page 29: ...Parts lists cont 29 Parts lists 5692 647 GB ...
Page 30: ...Parts lists cont 30 Parts lists 5692 647 GB ...
Page 31: ...Parts lists cont 31 Parts lists 5692 647 GB ...
Page 37: ...37 5692 647 GB ...
Page 38: ...38 5692 647 GB ...
Page 39: ...39 5692 647 GB ...