![Viessmann Cascade control unit Installation, Operating And Service Instructions Download Page 14](http://html1.mh-extra.com/html/viessmann/cascade-control-unit/cascade-control-unit_installation-operating-and-service-instructions_1017651014.webp)
14
Control
General details
Activating operating levelĂ3 (see pageĂ10).
to confirm
Operating level
Please note:
If in the following you wish to
jump to the next menu item,
continue with .
Operating details
confirm; operating details
appropriate for the relevant
system can be selected with
or , e.g. type version
back to previous menu
Set values
confirm;
/
for selecting
summertime
start
or
summertime end
confirm
/
for selecting the month
confirm
Please note:
If "Summer/wintertime auto"
was configured (see p.Ă11), the
system will change over
during these months.
back to previous menu
Relay test
confirm;
display
pump
display flashes
for selecting relay
back to previous menu
Configuration
confirm; "No" flashes; if you
want to configure, select
"Yes"
confirm; language flashes
for language selection
confirm;
Display
Summer/wintertime
auto
"Yes" or No" flashes
for selection;
confirm;
Display
Configuration
Date
and
time
Date flashes
/
for selection of required value
confirm
General control unit
5862Ă474ĂGB