Introductory information
For your safety
Please follow these safety instructions closely to prevent accidents and
material losses.
In emergencies
Immediately isolate the mains
electrical supply, e.
g. by removing
a separate mains fuse or by means
of a mains electrical isolator
(unless you smell gas).
In case of fire, use an appropriate
fire extinguisher.
Work on the equipment
Installation, initial start−up,
inspection, maintenance and repairs
must only be carried out by a
competent person (heating
engineer/refrigeration specialist/
installation contractor).
Before undertaking work on the
equipment/heating system, isolate
the mains electrical supply (e.
g. by
removing a separate mains fuse or
by means of a mains electrical
isolator) and safeguard against
unauthorised re−connection.
Installation of additional
components
Installation of additional components
which have not been tested together
with the boiler can adversely affect
the boiler function.
Our warranty does not cover
damage caused by the installation of
such components, nor do we accept
liability for such damage.
Boiler room conditions
Do not use rooms where the air is
polluted with halogenated
hydrocarbons (e.
g. as contained in
aerosols, paints, solvents and
cleaning agents)
Do not use rooms with high levels
of dust
Do not use rooms with permanently
high levels of humidity
The room should be frost protected
Max. ambient temperature 35
º
C