IM-FT 591480 0318
12
3.3 Mounting WC carrier Model 8108.1US
3.3.1 Suitable walls
The WC carrier can be mounted on the following
walls:
• Standard or structural 2 x 4 steel studs,
minimum 25 gauge
• Standard 2 x 4 wooden studs (actual 1½" x
3½"), 19" apart.
3.3.2 Steel stud mounting
X1
90°
X2
1
X1
X3
X2
Ø ⅜"
6x
Ø ⅜"
6x
½"
⅝"
X2
0
X1
2
3
5
4
6
1. If necessary, adjust (pre-
mounted) foot depth from 3"
(75 mm) to 2" (50 mm). Pull
the foot out and turn 90° if
necessary.
2. Determine construction
height, based on desired
bowl height, and mark wall
39" above surface of the
finished floor. Tighten bolts
on feet with
⅝" wrench.
x1 = 39"(1000 mm)
x2 = 0" (0 - 200 mm)
3.
Mark holes for floor supports.
4.
Mark holes for side support
at studs. Align carrier to
vertically level with front of
stud wall.
5.
Drill ⅜" holes. Measurements
above finished floor height.
x1 = 8½" (216 mm)
x2 = 15½" (393 mm)
x3 = 42½" (1080 mm)