Requirements:
n
The drain is connected.
n
The protective foil and the yellow protective plugs are to be found,
undamaged, on the drain.
Position odour trap onto the bare concrete ceiling.
Check the correct seating of both O-rings on the flange.
Push the flange into the drain unit as far as it will go.
Position the drain at the desired height at the place of use.
Depending on planning, the drain can be integrated into concrete,
screed or a heat insulation layer, for example. It is important that the
upper edge of the drain flange is flush with the upper edge of the
sealing layer. If necessary, raise or lower the drain in the existing
floor using suitable material.
Align drain horizontally using a spirit level.
Secure the drain in such a way that it cannot shift when the subse-
quent works are applied.
Most importantly, it must be ensured that the drain does not float
when the concrete or screed is poured in.
Handling
Advantix Advantix bath drain 62 mm, (reconstruction model)