3 Handling
3.1
Assembly information
3.1.1
Important note
Before assembly:
n
Check if the drainage capacity of the drain is sufficient for the arising
water volume
Ä
Chapter 2.2.3 „Drainage capacity“ on page 7.
n
Check if the installation height of the drain corresponds with the
planned floor construction.
n
Ensure that the required connection line is installed with the neces-
sary incline to the planned installation location.
n
If necessary, supply the required accessories
Ä
Chapter 2.5
„Required accessories“ on page 12.
During assembly:
n
Observe installation dimensions.
After assembly:
n
The drain flange must be fully lined with mortar.
Handling
Advantix Advantix bath drain 62 mm, (reconstruction model)