Careful planning is required for professional sealing. In addition,
depending on the individual dampness wear class and the type of foun-
dation, a suitable BS system with a building regulations certificate of
suitability must be chosen.

Furthermore, the following factors should be taken into account:

n

Drain or shower channel must be equipped with a special flange,
which has an adhesive surface and a width of at least 30 mm.

n

For bridging the material change from drain to screed, either a suit-
able sealing collar or sealing tape designed for overlapping with the
BS over a width of at least 50 mm must be used.

n

The screed must be laid at a minimum incline of 1–2 %.

n

The installation must be carried out properly in acc. with the
mounting instructions and the manufacturer's information.

1

9

8

7

6

2

3

4

5

Fig. 4: Construction diagram of the bonded seal - min. screed incline 1–2 %

1 - Grate

2 - Top piece with adhesive flange

3 - Tile

4 - Tile cement

5 - Bonded sealing

6 - Screed

7 - Sealing collar

8 - Mat

9 - Adhesive flange

In connection with suitable drains, only approved bonded sealings with
proof of practicability in keeping with building law may be used. See

Ä

 „Regulations from section: Sealing“ on page 6.

Information regarding the procedure can be found in the instructions for
use of the corresponding product.

Important note

Permitted bonded seals

Product information

Advantix Advantix bath drain 62 mm, (reconstruction model)

11 from  21

Summary of Contents for 4980.60

Page 1: ...for bonded sealing tiled shower with sealing mat Model Year built 4980 60 from 01 2012 en_INT Advantix Advantix bath drain 62 mm recon struction model Instructions for Use...

Page 2: ...Advantix Advantix bath drain 62 mm reconstruction model 2 from 21...

Page 3: ...formation for use 9 2 4 1 Installation variations 9 2 4 2 Sealing 10 2 4 3 Fire protection 12 2 5 Required accessories 12 3 Handling 14 3 1 Assembly information 14 3 1 1 Important note 14 3 1 2 Instal...

Page 4: ...nd to possible operating instructions The installation of Viega products must take place in accordance with the general rules of engineering and the Viega instructions for use 1 2 Labelling of notes W...

Page 5: ...DIN DVGW Some passages in the text may refer to technical codes in Europe Germany These should serve as recommendations in the absence of corresponding national regulations The relevant national laws...

Page 6: ...h proof of practicability in keeping with building law for stress classes A and AO ETAG 022 T1 Approved bonded sealings with proof of practicability in keeping with building law for stress classes A B...

Page 7: ...c tion Fields of application on page 6 Check if the drainage capacity is sufficient before mounting 2 2 2 Media The drain is intended for draining of household type wastewater in con stant operation s...

Page 8: ...DN drain socket 40 50 Drainage capacity Chapter 2 2 3 Drainage capacity on page 7 Dimensions and installa tion height Chapter 3 1 2 Installation dimen sions on page 15 Water head seal 25 mm Load class...

Page 9: ...floor at the same time NOTICE The creation of a floor recess must be agreed with the fol lowing people a structural engineer the on site fire protection inspector or the specialist engineer for fire...

Page 10: ...ss and the underground as well as the selection of the suitable bonded sealing must be carried out in compliance with the valid standards and regulations see Regula tions from section Sealing on page...

Page 11: ...d n The screed must be laid at a minimum incline of 1 2 n The installation must be carried out properly in acc with the mounting instructions and the manufacturer s information 1 9 8 7 6 2 3 4 5 Fig 4...

Page 12: ...an be achieved Fig 5 Example fire protection pipe lead in Mounting instruction of the R120 pipe lead in see model 4923 5 Art No 491 673 2 5 Required accessories Advantix tops are available in a number...

Page 13: ...barrier which also closes the drain odour tight if the water seal in the odour trap has evaporated Odour nuisance is even avoided with drains that are only seldom used Odour barriers can be found in...

Page 14: ...corresponds with the planned floor construction n Ensure that the required connection line is installed with the neces sary incline to the planned installation location n If necessary supply the requi...

Page 15: ...ing the drain The connection to the wastewater system must be completed before the drain can be installed in the floor construction Proceed as follows Requirements n A pipe to the planned drainage pos...

Page 16: ...ap Align the connection elbow on the joint Push the drain socket into the drainpipe completely 3 2 2 Prepare for subsequent work A few points must be observed to integrate the drain into the floor con...

Page 17: ...can be integrated into concrete screed or a heat insulation layer for example It is important that the upper edge of the drain flange is flush with the upper edge of the sealing layer If necessary rai...

Page 18: ...ue to improper installation If hollow spaces occur during the lining of the drain leaks may occur when pressure is applied Check the proper completion of the subsequent work Screed and floor tiles mus...

Page 19: ...for use Lay the sealing collar into the bonded sealing Apply a second layer of bonded sealing onto the sealing collar and if necessary onto the floor 3 2 4 Mounting the top The top with the grate mus...

Page 20: ...floor covering 3 3 Care 3 3 1 Care tips Normal soap or a mild cleaning agent can be used for regular care and prevention of lime scale on the grate and frame Under no circum stances should scouring ag...

Page 21: ...mersion pipe Re insert grate 3 4 Disposal Separate the product and packaging materials e g paper metal plastic or non ferrous metals and dispose of in accordance with valid national legal requirements...

Reviews: