Fig. 12: CRV on the storey
n
Set the temperature and flow regulation before commissioning.
n
Use in the section: Bring flowthrough control to position II.
n
Use on the storey: Bring flowthrough control to position I.
n
For thermal disinfection: Bring flowthrough control to position t.D..
n
Temperature setting: Set to calculated target value.
Settings
Handling
Easytop circulation regulation valve S/E with SC-Contur
24 from 27