Open the press jaw and place it at a right-angle onto the press con‐
nector.
Check the insertion depth using the marking.
Ensure that the press jaw is placed centrally on the bead of the
press connector.
Carry out the pressing process.
Open and remove the press jaw.
▷
Connection is pressed.
3.2.4
Installation position and settings
Installation is possible in both the riser pipe and on the storey.
If there are multiple riser pipes on the storey during the installation of
the circulation regulation valve, then every riser pipe must have a circu‐
lation regulation valve mounted, see
.
NOTICE!
According to the applicable directives, circulation regulation
valves must be installed between the outlet of the hot water
tank and the circulation inlet, see
tion: Installation position and settings“ on page 7
.
Installation position
Handling
Easytop circulation regulation valve S/E with SC-Contur