3.2
Assembly
3.2.1
Leakage test
The installer must perform a leakage test before commissioning.
Carry out this test on a system that is finished but not covered yet.
Comply with the general rules of engineering and the applicable direc‐
tives, see
„Regulations from section: Leakage test“ on page 8
Perform leakage test should in acc. with the general rules of engineering
for non-potable water installations.
Document the result.
3.3
Maintenance
NOTICE!
Inform your customer or the operator of the potable water
installation that the system has to be maintained on a reg‐
ular basis.
Observe the applicable regulations for the operation and maintenance
of potable water installations, see
„Regulations from section: Mainte‐
Viega recommends actuating the fitting regularly and
checking its function.
3.4
Disposal
Separate the product and packaging materials (e. g. paper, metal,
plastic or non-ferrous metals) and dispose of in accordance with valid
national legal requirements.
Handling
Easytop ball valve
15 from 15