14
Step 5: Install Fuse
Install a suitable fuse in each fuse holder in the following order:
1. Battery circuit
2. Load circuit
Step 6: Confirm power on
When battery power is applied and the controller starts up, the battery LED indicator will be
green.
If the controller doesn't start up, or the battery status LED error is on, please refer to section
5 for troubleshooting.
Summary of Contents for Bluesolar-10
Page 2: ...Manual EN Appendix BlueSolar Charge controller 12 24V 10A with timer ...
Page 3: ......
Page 5: ...2 ...
Page 31: ...28 ...