background image

I-VICFLEX.AB1/AB2/AB10_6

REV_R

I-VICFLEX.AB1/AB2/AB10 

/ Victaulic

®

 VicFlex

 Styles AB1/AB2/AB10 Brackets / Installation Instructions

INSTRUCTIONS FOR INITIAL USE OF A VICTAULIC

®

 FIRELOCK

 NO. 101 90° ELBOW OR 

NO. 102 STRAIGHT TEE INSTALLATION-READY

 FITTING WITH A SERIES AH1-CC, AH2-CC, OR 

AH2-CC-300 FLEXIBLE HOSE (1-INCH/DN25 IGS CONNECTION)

NOTICE

•  The following procedure applies only to 1-inch/DN25 No. 101 90° Elbows and No. 102 Straight Tees (IGS connection).
•  No. 101 90° Elbows and No. 102 Straight Tees do not ship preassembled to the Series AH1-CC, AH2-CC, or AH2-CC-300 Flexible Hose.
•  The No. 101 or No. 102 does not need to be fully disassembled for initial installation onto the inlet end of the Series AH1-CC, AH2-CC, or 

AH2-CC-300 Flexible Hose.

1. 

Loosen the nut of the Style 108 Coupling. Remove the Style 108 Coupling from the end of the Series 
AH1-CC, AH2-CC, or AH2-CC-300 Flexible Hose.

Spacer

Inspect

Inlet End

of Flexible Hose

2. 

Inspect the inlet end of the Series AH1-CC, AH2-CC, or AH2-CC-300 Flexible Hose to verify that there is no 
damage (dents, crushed edges, etc.). A new, Victaulic-supplied Series AH1-CC, AH2-CC, or AH2-CC-300 
Flexible Hose shall be used if any damage is present.

3. 

Verify that the spacer is oriented on the inlet end of the Series AH1-CC, AH2-CC, or AH2-CC-300 Flexible 
Hose, as shown to the left.

4.

  Loosen and remove the hardware from the side of the No. 101 90° Elbow or No. 102 Straight Tee that is intended to connect with the inlet of the 

Series AH1-CC, AH2-CC, or AH2-CC-300 Flexible Hose.

NO. 101

NO. 102

5. 

Insert the inlet end of the Series AH1-CC, AH2-CC, or AH2-CC-300 
Flexible Hose into the No. 101 90° Elbow or No. 102 Straight Tee. 
Verify that the gasket is seated fully in the gasket pocket of each 
housing and that the housings' keys engage with the spacer on the 
inlet end of the Series AH1-CC, AH2-CC, or AH2-CC-300 Flexible 
Hose.

5a. 

Reinstall the two bolts and nuts that were removed in step 4. 

NOTE:

 Verify that the oval neck of each bolt seats properly in the bolt 

holes. DO NOT tighten the nuts completely. The bolt pads need to 
be set at a gap for installation of the fitting. The nuts should be flush 
with the top of each bolt to provide the proper gap. Use caution when 
handling the fitting/hose assembly (the fitting may not be secured 
completely to the inlet end of the Series AH1-CC, AH2-CC, or 
AH2-CC-300 Flexible Hose).

6.

  Follow the steps in the I-101/103 or I-102/104 installation instructions for the required tightening sequence. 

NOTE:

 During tightening, verify 

that the inlet end of the Series AH1-CC, AH2-CC, or AH2-CC-300 Flexible Hose remains straight and aligned with the opening of the No. 101 
90° Elbow or No. 102 Straight Tee. The I-101/103 or I-102/104 can be accessed and downloaded by scanning the applicable QR code below. In 
addition, these instructions contain important reassembly instructions and shall be referenced any time a No. 101 90° Elbow or No. 102 Straight 
Tee is removed from the sprinkler piping and reused.

SCAN QR CODE FOR ACCESS TO THE FULL I-101/103 

INSTALLATION INSTRUCTIONS ON VICTAULIC.COM

SCAN QR CODE FOR ACCESS TO THE FULL I-102/104 

INSTALLATION INSTRUCTIONS ON VICTAULIC.COM

Summary of Contents for VicFlex AB2

Page 1: ...he use of this product and why it was specified for the particular application The installer shall understand common industry safety standards and potential consequences of improper product installati...

Page 2: ...sentative is responsible for referencing applicable standards to determine if additional sprinklers or other system adjustments are required The building owner or their representative is responsible f...

Page 3: ...cket Button Head Cap Screw 7 Hex Socket Button Head Cap Screw Hex Socket Button Head Cap Screw Reference publication 10 85 for listing information Square bar length is in reference to nominal ceiling...

Page 4: ...ted in the NOTICE below are met a thin coat of a compatible lubricant shall be applied only to the gasket sealing lips to help prevent pinching rolling or tearing during installation DO NOT use excess...

Page 5: ...Metric nut deep well socket tighten the nut until metal to metal contact occurs at the bolt pads Verify that the oval neck of the bolt seats properly in the bolt hole DO NOT continue to tighten the n...

Page 6: ...CC AH2 CC or AH2 CC 300 Flexible Hose NO 101 NO 102 5 Insert the inlet end of the Series AH1 CC AH2 CC or AH2 CC 300 Flexible Hose into the No 101 90 Elbow or No 102 Straight Tee Verify that the gaske...

Page 7: ...thread sealant tape on the threads of the adapter nipple The seal inside the nut of the flexible hose provides the leak proof connection Tighten the connection nut to a torque of 40ft lbs 54N m approx...

Page 8: ...TM C636 standards Verify that the ends of the Style AB1 AB2 or AB10 Bracket engage the rails Side Facing the Opening of the Center Gate Assembly 1a For center of tile installations align the end brack...

Page 9: ...nch lbs 6 N m approximately hand tight plus 1 2 to 3 4 of a turn NOTE Verify that the washer is seated under the head of the wing nut 2c FOR STYLE AB2 BRACKETS ONLY Close the gate around the sprinkler...

Page 10: ...re bar 2 Attach the end brackets of the Style AB2 Bracket to the T bar rails of the CD Profile 60 mm Channel Ceiling System Verify that the ends of the Style AB2 Bracket engage the rails 3 To secure t...

Page 11: ...TALLATION FOR ASTM C645 METAL JOISTS STUDS INSTALLED IN ACCORDANCE WITH ASTM C754 STANDARDS FM ONLY FOR AB1 AND FM UL FOR AB2 1 Install the flexible hose into the sprinkler piping and the sprinkler re...

Page 12: ...e of 36 inch lbs 4 N m approximately 1 2 to 3 4 of a turn past hand tight 7 Perform steps 2 2c on pages 8 9 to complete the installation ALTERNATIVE 1 METAL JOIST STUD INSTALLATION FM ONLY FOR AB1 AND...

Page 13: ...e of 36 inch lbs 4 N m approximately 1 2 to 3 4 of a turn past hand tight 7 Perform steps 2 2c on pages 8 9 to complete the installation ALTERNATIVE 2 METAL JOIST STUD INSTALLATION FM ONLY FOR AB1 AND...

Page 14: ...be removed The sprinkler piping s outside diameter OD groove dimensions and maximum allowable flare diameter shall be within the tolerances published in current Victaulic IGS specifications publicatio...

Page 15: ...sponsibility to verify suitability of stainless steel flexible hose for use with the intended fluid media within the piping system and external environment The material specifier shall evaluate the ef...

Page 16: ...end of a Series AH1 CC Flexible Hose the friction loss data shown above shall be added to the No 101 or No 102 friction loss data published in Victaulic publication 10 54 SERIES AH2 AND AH2 CC FLEXIB...

Page 17: ...imum Number of 90 Bends AH2 300 31 AH2 CC 300 31 31 790 1 2 17 0 3 DN15 5 2 3 4 16 0 DN20 4 9 AH2 300 36 AH2 CC 300 36 36 915 1 2 25 0 4 DN15 7 6 3 4 22 0 DN20 6 7 AH2 300 48 AH2 CC 300 48 48 1220 1 2...

Page 18: ...REGIONAL AVAILABILITY ONLY Model Length of Flexible Hose inches mm Outlet Size inches Metric Equivalent Length of 1 inch DN25 Schedule 40 Pipe feet meters Maximum Number of 90 Bends AH4 31 31 790 1 2...

Page 19: ...nd AB10 Brackets AMF Armstrong Chicago Metallic Dipling Durlum Geipel Gema Armstrong Hilti Knauf Lafarge Lindner Odenwald Richter Rigips Rockfon Pagos Suckow Fischer USG Donn Other manufacturers ceili...

Page 20: ...9 9 75 3 AH1 72 1830 72 14 26 25 98 46 8 85 2 178 mm 7 inch minimum bend radius Friction loss data is in accordance with GB5135 16 Corresponding flow rate is 113 55 liters per minute 30 gallons per mi...

Reviews: