
OLP-85/OLP-85P
37
D
ELETING
A
PROJECT
5 M
ANAGING
P
ROJECTS
2.
Edit the fields.
The changes are immediately effective.
3.
Press the
[
F
]
button to close the edit menu.
Deleting a project
1.
Select the project you wish to delete.
2.
Press the
[
A
]
key and tap
[
Remove
]
.
3.
Tap
[
Yes
]
to permanently delete the project.
The project is deleted and removed from the list.
Activating a project
To assign measurements to a project, the project must be
activated. There can always be only one active project.
1.
Select the project you wish to activate.
2.
Tap the
button.
– or –
Press the
[
A
]
key and tap
[
Set Active
]
.
Allow a few seconds until the label ACTIVE is displayed at the
selected project.
NOTE:
Savings of measurement results are assigned to the selected
project.
Summary of Contents for SmartClass OLP-85 Series
Page 82: ...OLP 85 OLP 85P 82 ROHS RoHS ...
Page 83: ...OLP 85 OLP 85P 83 ROHS ...