MANUAL VIAVAC-CB4 / 4.1 ( Expert section ) Art. nr. 50504 EN (01-07-2017)
__________________________________________________________________________________________
7
___________________________________________________________________________________
VIAVAC vacuum lifting BV T. + 31 348 449 660 E. [email protected] I. www.viavac.com
Continuation from previous page
APPROVED
Limited value
A D M Y 3Y
Control of vacuum pump
Switching on at vacuum level -0.65 bar
+/- 2%
- O O O
Time for switching off 10 sec after reaching vacuum level -0.65 bar
+/- 2 sec.
- O O O
Vacuum level after switching off
min. 70%
- O O O
Sealed condition
Decrease of vacuum in non-sucked state
max. 3 % in 60 sec.
- O O O
Decrease of vacuum level with wall panel suction pads in sucked state
max. 10 % in 60 sec.
- O O O
Decrease of vacuum level with roof panel extension set in sucked state
max. 10 % in 60 sec.
- O O O
Vacuum indicator
Compare level of vacuum indicator with digital vacuum switch
+/- 0.03 bar
O O O O
Battery
Capacity test
min. 85% of 55Ah
- - O O
Replace preventative
- - - O
Charging current of battery charger
min. 13V
- - O O
Level indicator (Voltmeter)
max. 1V difference
- - O O
Tests
O
Static load test
2x working load
- - O O
Holding time test
min. 5 minutes
- - O O
Stickers
Presence of all stickers present
- - O O
In readable condition
- - O O
Instruction manual
O
In readable condition
- - O O
Approval
Fill in this inspection and maintenance report and undersign for approval.
- - O O
Fill in the maintenance record of the instruction manual.
- - O O
When everything is approved, apply new certification sticker with date indication.
- - O O
____________________________________________________________________________________________________________________________
Remarks
(A = Available / D = Daily / M = Monthly / J = Yearly / 3 Yearly)
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Inspection & maintenance
executed by : _________________________________ Valid till : __________________