37
Destined for service organization
VIADRUS a.s
Bezru
č
ova 300
735 81 Bohumín
Guarantee certificate and Quality & completeness certificate for
Woodpell boiler
Boiler serial number
..............................…………
Boiler output
............................................
User (surname, name)
………………………………………………………………………………………...
Address (street, city, postcode) ………………………………………………………………………………………...
Telephone/Fax
………………………………………………………………………………………...
Boiler matches the requirements
EN 303-5
Boiler for central heating – Part 5: Solid fuel boiler for central heating, with manual or
automatic feed and nominal thermal output max. 300 kW: terminology, requirements,
testing and marking.
Measured values
Numerical value
Chimney draught (Pa)
Temperature of combustion products (°C)
VIADRUS a.s. provides the guarantee:
–
for boiler for 24 months after the date of putting it into operation, but maximally 30 months after the date
of despatch from the production plant
–
for cast iron boiler drum for 5 years after the date of despatch from the production plant let
The conditions for the guarantee validity:
•
the boiler installation must be carried out according to „Boiler operation and installation manual “
by a qualified installation company
•
the boiler must be put into operation according to „Boiler operation and installation manual “ by
a contractual service organization accredited by the manufacturer
•
the defects elimination must be carried out by the contractual service organization accredited by
the manufacturer
The boiler delivery completeness is guaranteed by the seller.
Unfilled guarantee certificate is invalid.
The user confirms that:
•
the boiler adjusted by the contractual service organization did not show any fault during the heating test
•
he received the “Boiler operating and installation instruction” incl. the duly filled-out Guarantee certificate
and Quality certificate
•
he was made acquainted with boiler attendance and maintenance
……………………………………..
……………………………………..
……………………………………..
Boiler manufacture date
Manufacturer’s stamp
Checked by (signature)
……………………………………..
……………………………………..
……………………………………..
Date of installation
Installation company
(stamp, signature)
User’s signature
……………………………………..
……………………………………..
……………………………………..
Date of putting the boiler into
operation
Contractual service organization
(stamp, signature)
User’s signature