F
Button of manual operation - actuation of the boiler to the preselected temperature 60 °C, all pumps run, the
mixer is not controlled - a symbol will displayed on the display
.
G
Button Sweeper - at a short press of the button, the boiler will go to the emission measuring mode. This button
serves for authorized service technician.
H
Switch of operation modes for heating circuits
- running according to the preselected time mode (a transition to the summer mode on the basis of outdoor
temperature is active)
- continuous running to the nominal required temperature
- continuous running to the dumping required temperature
- keeping the anti-frost required space temperature
I
Display
J
Information button - information of the actual state of the boiler, heating circuits, HW and error messages.
8.2.1
Energy saving
•
Use automatic mode.
•
Set the required comfort temperature.
•
Use a time program.
The main rule is to remain a type of operation in the Automat mode: In this type of operation the regulator monitors
heating for optimal heat consumption (for example: transition summer/winter).
Or you can individually adjust a type of operation to the anti-frost, permanent dumping, comfort, in dependence on
your needs.
Set a comfort temperature, which has to be maintained during the period of using the room, thus during the period
which is set in the time program.
Use a time program to set the period, when a comfort temperature has to be maintained, and out of the comfort
temperature the regulator will heat to the dumping temperature. Setting the time program should comply with an
occupation of the room or the night dumping. The time program is only used in the Automatic type of operation.
Hot water heating...
Setting a type of operation, temperature and a time program for HW heating is
the same as the setting for heating.
8.3
Review of settings
The tables displays all user-accessible settings.
Time and date
Parameter
Function
Production settings
Min.
Max.
Units
1
Time
----
00:00
23:59
hh:mm
1
Date
----
01.01.
31.12
dd:MM
5
The start of the summer time
25.03.
01.01.
31.12.
dd:MM
6
The end of the summer time
25.10.
01.01.
31.12.
dd:MM
The actual date and time has to be set by reason of a correct function of the time programs of the heating circuits
and hot water.
Time program TO1
Parameter
Function
Production settings
Min.
Max.
Units
500
Preselection
Mo-Su
00:00
24:00
hh:mm
501
Mo-Su: 1. Phase on
6:00
00:00
24:00
hh:mm
502
Mo-Su: 1. Phase off
22:00
00:00
24:00
hh:mm
503
Mo-Su: 2. Phase on
24:00
00:00
24:00
hh:mm
504
Mo-Su: 2. Phase off
24:00
00:00
24:00
hh:mm
505
Mo-Su: 3. Phase on
24:00
00:00
24:00
hh:mm
506
Mo-Su: 3. Phase off
24:00
00:00
24:00
hh:mm
516
Standard values
Su
1. (2, 3) Phase on
the start of the heating phase to the selected comfort temperature.
1. (2, 3) Phase off
the end of the heating phase to the selected comfort temperature and the transition to the
dumping temperature.
Standard values
reset of the time program to the production values
Summary of Contents for VIADRUS K 5
Page 1: ...1 VIADRUS K 5 Manual for boiler operation and installation GB_2016_42 GB_2016_47 ...
Page 19: ...19 7 9 Connection of the system LIK 60 100 1 Flange 60 100 2 Screw M4 x 12 ...
Page 30: ...30 ...
Page 32: ...VIADRUS K 5 VIADRUS a s Bezručova 300 E mail CZ 735 81 Bohumín info viadrus cz www viadrus cz ...